Our customer based in Chislehurst BR7 wanted to extend their loft to create another bedroom.  We met with the customer at their home in BR7 to discuss their ideas for extending their property into their loft. After doing a site survey we suggested that a Hip to Gable loft conversion with Dormer and Bathroom ensuite would suit the loft space best. They also wanted to make us of space at the top of the stairs and turn it into a small walk in wardrobe.

We began work on the conversion and these are the results. The build took around 8 weeks to complete start to finish.

chislehurst loft conversion
chislehurst loft conversion
chislehurst loft conversion

Project: Loft Conversion 1 Bedroom with Bathroom Ensuite – Hip to Gable Rear Dormer Project

 

Item Description 
Building Control, Party Wall Agreement(s) & Architectural Plans Building Control to be submitted by us, Party Wall Agreements will be drawn up for you to sign if they are needed and Plans to be supplied by us
Roof Windows 2x MK04 1x CK02
Bedroom(s) 1 Dormer/Gable Bedroom with Bathroom
Walls The first floor wall has been checked and wall does need moving on first floor for stairs
Windows Bedroom Balcony: 1800×2000 Bathroom: 800×1000

Stairwell: 600×1000

Flooring Water Resistant Interlocking 22mm Flooring
Roofing and Dormer Coverings New Redland Tiles, flat roof will be EPDM rubber plus new fascia and guttering on front dormer/side slopes with tiled finish to dormer/gable to match new tiles
Carpentry
Skirting and Architraves to match existing style and storage doors
Pine Staircase Double Wind Staircase with pine strings, posts, square newels, square spindles, treads and handrail set to existing landing size
Plumbing
1 Radiator, 1st & 2nd Fix Plumbing and Fitting of Bathroom
Electrical 1st & 2nd Fix, Two lights to front storage area, 3 smoke detectors, 4 double sockets to be fitted per room where client decides and extractor fan
Plastering Plastering of new loft space, first floor ceiling and Landing
Lighting Removal of Existing Electrical wires in loft space and 10 Lighting Points will be fitted to your new ceiling and Light Switches will be fitted to the bottom and top of the stairs as well as every new room
Scaffolding Included as necessary
Loft Space Accessibility To the front roof for steels and timber